Institute for Geophysics

Understanding the Earth and other planets to solve key problems that affect us all. The world needs geophysicists!

  • About
    • Institutional History
    • Mission & Science
    • Code of Conduct
    • Job Listings
    • Postdoctoral Fellowships
    • Outreach
    • Contact
    • UT Austin Science Olympiad
  • News
    • Media Releases
    • Geophysics Blog
    • In the News
    • Staff and Student Awards
    • Media Contacts
  • Research
    • Climate
    • Polar and Planetary
    • Energy
    • Marine Geosciences, Seismology and Tectonics
  • Staff
    • Research Scientists
    • Postdoctoral Fellows
    • Administrative Staff
    • Scientific Support Staff
    • Research Affiliates
    • Find an Expert
  • Students
    • Current Students
    • Recent Graduates
    • Meet the UTIG Student
    • Prospective Students
    • UT Marine Geology & Geophysics Field Course
  • Seminars
  • COVID-19
    • JSG Coronavirus Updates
    • Give to UT’s Student Emergency Fund

May 19, 2017

GOM^2 Blog Entry 5: Punched in the Mouth

“Everyone has a plan ‘till they get punched in the mouth.”
-Mike Tyson

This past week, we got punched in the mouth. Heading into this expedition, I had expectations somewhere between optimistic and unrealistic. We came out here with the ability to bring back 20 pressure cores. Somewhere along the way I convinced myself that returning with 20 pressure cores was a foregone conclusion. Not so much…

The coring bit used to during the first deployment. (Photo credit Peter Polito)

We entered our first hole with optimism, but after the first three cores, we were entirely deflated. While we did recover core, the tool was not holding pressure, meaning all the hydrate was gone—disassociated—by the time it reached the rig floor. We planned to hold off on taking the fourth core until we could run a function test in the water column, but there was a miscommunication and a fourth pressure core was taken instead. And wouldn’t you know it…our first successful pressure core! Core 4 came to the surface under pressure and with a meter and a half of hydrate-bearing sediment. This victory was like a shot of adrenaline to our team and we barreled into core 5 with renewed optimism. Alas, the optimism was not to last. The next four cores were all unable to hold pressure.

At this point, we did what I make my five and six-year-old do whenever we cross the street. We—the UT Science Party, Geotek, and the tool operator—stopped, looked, and listened. We decided to terminate this borehole early. This approximately 30 hour process to log and cement the borehole was a much needed 30 hours that allowed us to stop, and take stock of the eight tests, digging deeper into the data, looking for evidence that might elucidate the source of the tool’s problems. We took this time to look over the tool. We studied images of the tool that we’d taken as it came out of the hole. We looked at the sediment that was embedded in some of the tool’s moving parts. We looked at the engineering drawings, inspecting closely the recent changes, trying to identify some source of our consternation that we may have missed. And most importantly, we listened. 30 hours of conversations, of data discussions, lunchtime chats, hallway ideas—you name it.

In the end, we came up with a series of tests to run under a specific set of conditions to help us better understand the potential source of the problem and to see if the tool was ready to try again. That was Tuesday. Today is Thursday, and we just brought up a beautiful 2.2 m core, the first coring attempt in the new hole.

Now we march forward. I’m optimistic. Not the blind optimism I had when we took our first core, but an optimism rooted in the experience of both success and failure, and the belief that maybe, just maybe, we’ve learned something.

As the team contemplated how to move forward, they spent a lot of time enjoying the beauty surrounding them. (Video courtesy of Peter Polito)

Filed Under: GOM2 News, homepage-news, News, Stories Tagged With: GOM2 Expedition, methane hydrate

Tweets by UTGeophysics

University of Texas Institute for Geophysics

J.J. Pickle Research Campus,
Building 196
10100 Burnet Road (R2200)
Austin, TX 78758-4445

Phone: 512-471-6156
Fax: 512-471-2370

Driving Directions

Connect with us

  • Facebook
  • Instagram
  • Twitter
  • YouTube

QUESTIONS?

frontdesk@ig.utexas.edu
or contact the webmaster
social@ig.utexas.edu

RESOURCES

Seismograms

Publications Database

Texas ScholarWorks

Travel Guide for UTIG Employees

Google Scholar

Facilities

HELPFUL LINKS

Directory (EID)

Job Listings

UTIG Fact Sheet

UTIG Brochure

UTIG Science Vision Plan

UTIG Newsletter

UTIG Code of Conduct

Commitment to Diversity, Equity, and Inclusion

OUR PARTNERS

Bureau of Economic Geology

Department of Geological Sciences

Center for Planetary Systems Habitability

Visit the Jackson School's website

Copyright © 2022 University of Texas Institute for Geophysics
The University of Texas at Austin · Web Privacy Policy · Web Accessibility Policy